From the level net shown, it is required to compute the adjusted elevations of $BM_2$, $BM_3$, and $BM_4$ if $BM_1$ = 100m.
a = +21.14m.
b = +5.08m.
c = -10.06m.
d = -15.96m.
e = -5.20m.

The correction must be such that the elevation difference between any pair of benchmarks shall be the same by whatever route is computed.
    1. 121.12; 126.12; 115.98
    2. 122.22; 122.22; 124.29
    3. 132.48; 120.39; 120.38
    4. 112.21; 120.39; 111.31